The Test Meter

With a test meter you can verify your integrations with energiedaten.at without needing a real Zählpunkt number or going through the consent process.

Form "Connect Smart Meter" with the "Add test meter" option in the top right.
Form "Connect Smart Meter" with the "Add test meter" option in the top right.

What Is a Test Meter?

A test meter is a simulated Smart Meter with realistic synthetic data. It behaves in the app just like a real meter — with charts, analyses, and delivery connections — but uses no real readings. This lets you test your data pipeline end-to-end.

When Is It Useful?

  • You are testing a delivery connection (webhook, MQTT, CSV, API) and need a data stream.
  • You want to verify your integration before connecting real meters through the consent process.
  • You are evaluating the platform on a Starter, Growing, or Business plan.

Creating a Test Meter

Click "Add Smart Meter" and select "Add test meter". You will be prompted to choose a building type — this influences the consumption pattern of the synthetic data.

Building Type and Data Pattern

The building type you choose determines what the synthetic data looks like: an office building has different load profiles than a single-family home. Choose the type that most closely matches your real use case to get realistic results.

Notes

Meter limit: Test meters count towards your meter quota. If you reach your limit, delete the test meter before connecting a real meter.

Data is marked as test: In the app, test data is clearly labelled as such so it cannot be confused with real readings.

Switching to a real meter: Delete the test meter and add your real meter via "Add Smart Meter". Direct conversion is not possible.